Skip to main content

defined Holiday/Off-period setting

Requirements:

  • ​Bulk Availability: Automatically set training time to 0 minutes for the selected period.

  • ​Mute Notifications: Suppress "Why did you miss your workout?" prompts and "Update Availability" reminders during these dates.

  • ​Plan Protection: Treat the period as "Planned Rest" so the JOIN level/stamina logic doesn't penalize the user for inactivity.

​Reasoning: Reduces manual daily updates and eliminates the friction of being asked for feedback while the user is intentionally off-bike.

1 comment

Log in to comment and vote

Comments1

  • Liam Gaul

    •

    May 16

    Similar to this, set long-term availability. Like 99% of people, long rides are only possible on the weekend, however some weekends I am away and have plans and can’t ride at all. Would be good to schedule these in advance so that JOIN can account for this and move long rides or workouts to other weekends around these dates and increase mid-week rides. Currently, I have been given a recovery week with no long rides on the weekend right before 2 weekends in a row where I can’t ride and 4 weeks before doing the longest multi-day ride of my life so getting long rides in is essential. Would obviously be ideal to have that recovery week a week later when my weekends are unavailable, which JOIN could plan for if I could set my long-term availability, so now I have to ignore the plan and do my own thing. Only being able to set current week availability is a massive flaw.